The PUDs are part of an agreement the federal agencies have with Canada over the flow of water on the Columbia River, which is called the Columbia River Treaty.
The process will require a $25,000 prepayment to the Bonneville Power Administration for design, material and labor so the Administration can make upgrades at its Valhalla Switchyard.